jasonbx
Joined: 07 Feb 2006 Posts: 60 Location: SLC, Utah
|
Posted: Sun Mar 03, 2013 12:49 pm Post subject: Prioritizing cave leads/projects? |
|
|
Does anybody have a system they use to prioritize cave leads or projects? I have half a dozen leads I want to follow up on this summer, all in different directions.
A few choices are easy. Hot desert leads are going to be earlier in the year than high alpine leads. But trying to decide between others is tougher. Short walk to dig lead. Longer walk to rope work lead. Really long steep walk to possible walk in open entrance. Steep hike to bedrock modification project with huge potential.
Anybody have thoughts on how they prioritize such things? |
|